Before you sign
Ask for a complete written agreement identifying the contractor, the work, materials, price, payment schedule and expected dates. Put verbal promises in writing, fill every blank and keep a signed copy. The FTC recommends a written contract even where state law does not require one. (consumer.ftc.gov)
Use the checklist below to clarify responsibilities and changes—not as a substitute for local legal requirements.
This guide focuses on US residential remodeling and repairs. State and local contract requirements vary; the California and New York City examples below apply only within those jurisdictions. New-home construction, rental properties and commercial work may require a different review. (consumer.ftc.gov)
1. Attach a scope that describes the finished job
Start with this question: “What exactly will I receive for the contract price?”
California’s Contractors State License Board (CSLB) recommends specific descriptions of materials and work rather than broad labels such as installing kitchen cabinets. It also advises including cleanup, debris removal and special instructions in the agreement. (cslb.ca.gov)
For your project, ask the contractor to attach a dated scope covering:
- The rooms, surfaces and systems included.
- Product selections, model numbers and finishes where known.
- Preparation, protection, installation and finishing work.
- Demolition, disposal and final cleanup.
- Work expressly excluded.
- Drawings, specifications and selection lists that form part of the agreement.
For example, ask whether “paint the room” includes wall repairs, ceilings, trim, preparation and moving furniture. Do not assume a broad description answers those questions.
Practical check: Read the contract against the accepted estimate. If they differ, ask which document controls and have the difference resolved before signing. Ask how conflicting drawings or attachments will be handled.
The FTC recommends including promises made during conversations about scope and labor or material costs. A reassuring verbal explanation should not remain outside the written agreement. (consumer.ftc.gov)
2. Connect each payment to a clear milestone
Ask: “What must be completed or supplied before this payment becomes due?”
The FTC advises against paying the full project price upfront and says some states limit down payments. It also recommends not making final payment until the work is complete and you are satisfied. (consumer.ftc.gov)
For each proposed payment, request a description of:
- The amount due.
- The work or delivery that triggers it.
- The supporting invoice or documentation.
- How completion will be checked.
- How approved changes affect the schedule.
Avoid accepting “second payment” as the entire milestone description. Ask the contractor to identify an observable stage of work.
Also clarify uncertain prices. For every allowance or estimated item, ask whether it includes materials, delivery, tax, installation and markup. Ask how actual costs will be documented and how unused amounts will be credited. Do not assume every contract handles allowances identically.
Common mistake: Agreeing on the total price but leaving the payment triggers unresolved.
Before signing, also discuss what documents accompany final payment: agreed completion records, inspection results where applicable, warranties, operating instructions and locally appropriate lien documentation. Have any withholding or retainage arrangement reviewed for your jurisdiction rather than inventing a percentage.
3. Assign responsibility for subcontractors, permits and communication
Use the contract review to establish one clear route for decisions. Ask:
- Who supervises the work each day?
- Who coordinates subcontractors?
- Who checks their work and handles corrections?
- Who pays subcontractors and suppliers?
- Who can approve substitutions or additional work?
- Who is your contact when the usual supervisor is absent?
Ask for these responsibilities to be recorded rather than relying on a salesperson’s explanation.
Payment documentation deserves particular attention. In California, CSLB warns that unpaid subcontractors or suppliers can assert mechanics liens even when the homeowner has already paid the direct contractor. A contract promise to pay subcontractors should not be treated as proof that payment occurred. (cslb.ca.gov)
Ask the relevant local authority or a construction attorney what notices, releases and payment safeguards fit your project.
For permits, request a written allocation of who identifies required approvals, obtains them, pays the fees and coordinates inspections. California’s consumer guidance specifically calls for written direction about who obtains necessary permits. (cslb.ca.gov)
Practical check: Ask who will provide permit and inspection records to you. Do not leave that question until the walls are closed.
4. Define dates, delays and owner decisions
A useful schedule discussion goes beyond a finish date. AIA Contract Documents explains that construction agreements may allow time adjustments for specified causes, and that owner-requested changes can affect both time and price. The applicable contract determines how those adjustments are handled. (learn.aiacontracts.com)
Ask the contractor to clarify:
- What must happen before work starts.
- Which dates are estimates and which are contractual commitments.
- When you must select products or provide access.
- Which events may justify an extension.
- How quickly delays must be reported.
- What information accompanies a request for more time.
- Whether an extension can also produce additional charges.
For example, ask what happens if a selected fixture is unavailable. Will the contractor propose a substitute, rearrange unaffected work or request an extension? Who approves the response?
Common mistake: Accepting “subject to delays” without asking how a delay will be documented or how the revised date will be established.
Also discuss occupied-home arrangements: working hours, access, temporary protection, cleanup and any planned service interruptions. Treat these as project-specific terms to negotiate, not promises implied by a completion date.
5. Agree on the change-order process before work starts
A change order records an agreed modification to the contract. Under the AIA A201 framework, it addresses three essentials: the changed work, the price adjustment and the time adjustment. That framework includes architect participation; it is not automatically the procedure for every residential contract. (learn.aiacontracts.com)
Ask your contractor:
- Who may request a change?
- Who prepares and signs the proposal?
- What cost breakdown will you receive?
- How will credits for removed work be calculated?
- How will schedule effects be stated?
- What happens while approval is pending?
- What procedure applies to urgent protective work?
As a practical review checklist, request a change-order number, description, supporting attachments, price increase or credit, revised contract total, time effect and required signatures.
Record explicitly when a change has no price or time effect rather than leaving those fields ambiguous.
Common mistake: Saying “go ahead” before knowing the cost and schedule consequences.
For California home improvement work, CSLB states that changes to contract price or scope require a written change order signed by the customer and contractor before the change. Elsewhere, confirm the applicable requirements and the procedure in your agreement. (cslb.ca.gov)
6. Worked example: an unexpected wall repair
Consider this hypothetical document-review example, not a repair specification or price estimate.
Your remodeling contract includes removing a cabinet, patching the opening and painting the affected wall. Once the cabinet is removed, the contractor reports damage extending beyond the expected patch area.
Concealed conditions are among the reasons AIA identifies for construction changes. Finding one does not, by itself, establish the appropriate repair, price or allocation of responsibility. (learn.aiacontracts.com)
Instead of approving “extra wall work,” work through the proposal:
| Review step | Question to resolve |
|---|---|
| Document the discovery | What was found, where, and what photographs or assessments support it? |
| Compare the original scope | Which repair work was already included, and what is genuinely additional? |
| Define the proposed work | Does the proposal cover assessment, repair, finishing, painting and disposal? |
| Check exclusions | Is any specialist investigation or additional hidden damage excluded? |
| Review the price | What are the additional charges, markups and credits for replaced original work? |
| Review the schedule | Does this affect the completion date or other trades? |
| Authorize the change | Have the required parties approved the written proposal? |
Suppose the new proposal replaces the original patch rather than adding to it. Ask the contractor to show how the original patch cost is treated, so you can identify possible duplicate billing.
If the extent remains unknown, ask for separate written authorization for assessment or investigation before approving an undefined repair. Discuss a spending limit and a further-approval step where appropriate.
The useful outcome is not simply permission to continue. It is a record of what changed, what remains uncertain and what you agreed to pay for.

7. Separate warranties, corrections and dispute procedures
CSLB advises getting offered labor and material warranties in writing, including contractor and manufacturer warranties. (cslb.ca.gov)
Ask for the actual terms, then review:
- What work or products are covered?
- When does coverage begin?
- Who receives a claim?
- How must you report a problem?
- What exclusions or maintenance conditions apply?
- Who handles a product claim versus an installation complaint?
- What response and correction process is promised?
Discuss unfinished or disputed work separately. Ask how the final walkthrough will occur, how remaining items will be recorded and how completion of those items affects final payment.
For disputes, ask whether the contract requires a particular notice method, negotiation period, mediation, arbitration or court location. Ask who pays the associated fees. Seek local legal review if you do not understand a clause or its consequences.
The FTC recommends first trying to resolve problems with the contractor, following telephone discussions with a certified letter and retaining records. It identifies state attorneys general and local consumer protection offices as possible sources of outside help. (consumer.ftc.gov)
8. Check local rules and finish with a signing checklist
Do not turn another jurisdiction’s rule into a nationwide standard.
California: CSLB states that home improvement projects exceeding $500 require written contracts. Its guidance generally limits down payments to $1,000 or 10% of the contract price, whichever is less. A separate CSLB page identifies an exception involving a qualifying blanket performance and payment bond; verify any claimed exception directly with CSLB. (cslb.ca.gov)
New York City: DCWP says home improvement contractors must provide a signed written contract and separate Notice of Cancellation, with a copy supplied before work begins. It also requires a precontract permit disclosure covering required permits, responsibility, steps, estimated fees and status verification. These requirements concern NYC home improvement work, not every construction project nationwide. (home4.nyc.gov)
Cancellation rights also require checking. Do not assume every contract has an identical cooling-off period; confirm the applicable notice, deadline and cancellation method.
Before signing, use this final discussion checklist:
- Contractor identity and signing authority are clear.
- Scope, drawings, selections and exclusions are attached.
- Payment amounts and triggers are understandable.
- Subcontractor, permit and supervision responsibilities are assigned.
- Dates, owner decisions and delay procedures are defined.
- Changes require a clear authorization process.
- Warranty, correction and dispute terms are available.
- Local notices and requirements have been checked.
- No blanks or unresolved promises remain.
- You will receive the complete signed agreement.
If an important answer remains “we’ll work that out later,” request a revised agreement. Review the revised version—not just the explanation—before committing.